Air Traffic Flow Management (ATFM)

إدارة تدفق الحركة الجوية

ENR 1.9 — Air Traffic Flow Management (ATFM)

NIL

No Air Traffic Flow Management (ATFM) procedures are currently in effect within the Damascus FIR (OSTT).

In the event that ATFM measures are introduced, they will be promulgated by NOTAM and subsequently incorporated into the AIP via amendment. Operators are advised to monitor NOTAM series for any temporary ATFM restrictions.

Reference: ICAO Doc 4444 (PANS-ATM), Chapter 3 — Air Traffic Flow Management.

ATFM Procedures

ParameterDetail
ATFM AuthorityDamascus ACC (OSTT) coordinates flow management within the FIR
ATFM MeasuresGround Delay Programs (GDP), Miles-in-Trail (MIT), rerouting as required
Slot TimesWhen ATFM is active, Calculated Take-Off Time (CTOT) issued; tolerance ±5 min
NotificationATFM measures promulgated by ATC message or NOTAM
CoordinationCoordinated with adjacent ACCs (Ankara, Beirut, Amman, Baghdad)

Capacity Management

FacilityCapacity FactorAction
OSDI (Damascus)Runway throughput / weatherGDP, holding, diversion
OSAP (Aleppo)Runway availabilitySequencing, rerouting
En-route sectorsController workloadMIT, level capping

Operators should monitor NOTAM and ATIS for current ATFM status. Flight plan filing at least 3 hours before EOBT is recommended when ATFM is active.